Past the drip edge.
How to attach a staggered roof.
Run the row of starter shingles 1 2 in.
Many pros shingle in a vertical line up the roof because it s much faster.
How to install roofing underlayment the proper way.
The treatment at valleys depends much on the formation but the same rules apply in that the ends should be angled supported and securely fixed.
I want to be.
At the hips the batten ends should be cut to an angle be fully supported by the hip rafter or timber noggins and securely nailed.
Stagger a shake downward a.
Up from the bottom of the eave.
Galvanized sheet metal bent at a 90 degree angle i e.
The first is to use slates all of one length say 20 inch.
To do this select shakes that are wide enough to span the seams between two shakes below which provides prevention from water intrusion similar to shingles on a roof.
Bent into an l shape.
How to tie a additions roof to existing roof roof designs to attach to existing home how to construct a roof from an exsisting shead how to attach a deck roof to existing roof how to add a roof over porch cost to tie into existing roof attache porch roof on house attach shed roof to house adding a roof to screened in porch adding a roof to existing.
This flashing is typically field fabricated from a sheet of 26 ga.
There are two easy ways to create staggered butt slate roofs.
If you aren t a skilled carpenter some studying can be concerned akin to how you can design an a frame roof or how to construct a wall.
Subscribe and share please.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
At hips and valleys.
Step flashing is used to provide a water tight connection where roofing adjoins a vertical juncture.
Check this out.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Posted march 4 2017 filed under roof installation roof repair maintenance.
Generally the whole frame is preassembled and all you.
Position them so the adhesive strip is toward the bottom and facing up.
Here there are you can see one of our attaching a roof to an existing roof collection there are many picture that you can browse do not miss them.
The roof is chalked for 20 inch slates with added headlap 4 inches instead of 3 inches or chalk lines every 8 inches.
Water can get in the seams between any two shingles but that s ok because shingles overlap and the seams are staggered.