Overlap the next strip of roofing material with the first by at least 4 inches.
How to apply rolled roofing finish.
To seal a plumbing vent spread roofing.
Use a 6 inch swath of roofing cement to attach the ends of your strips of roll roofing to the roof itself.
Attach drip edge along the edge of the roof with roofing cement.
Enlist the help of one or two helpers to handle the long strips.
Spread the roofing cement along the.
How to do it attach first course.
Cut the rolled roofing.
Use a trowel to scoop up the roofing cement.
Clean the roof with a broom to remove any debris.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
2 like any other roof project you should start this one by addressing the valleys.
Mark a chalk line to identify the end of your first layer.
Align the roofing with the chalk line and nail down the edge that runs along the drip edge working out any bubbles as you go.
Use 1 nails for re roofing.
Make sure the rolled roofing is parallel to the eve of the roof.
This will help to protect the subsurface.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.
When compared to shingles rolled roofing is far cheaper and much easie.
Apply about two inches worth of cement under either side to seal the roofing down and then nail it down making sure it still stays flat and even as you go.
Extend the front edge of the drip edge so it runs off the roof and into the.
Apply roofing cement to the roof.
Using a measuring tape measure 35 inches 89 cm up from.
Installing the rolled roofing 1.
Check the sheathing for any nails or screws that may be.
How to install roll roofing on low slope roofs.
The roofing should extend 1 inch beyond the drip edge.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Continue to attach the material with nails every 3 inches.
Use 1 inch nails for new roofing.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
Roll out the first sheet and ensure that it lies flat and even.