You also need to add furring strips.
How should furring be spaced for metal roofing.
Twenty four inches is a common spacing of furring strips for.
But roofers can install a vented metal roof that eliminates this potential problem.
Correctly measure the spacing of furring strips for a metal roof to further decrease condensation.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
Compare price of shingle metal or membrane roof.
Doesn t provide the flattest surface for the metal roofing to be installed over each course of shingles is about a 1 8 higher than the course just below it.
Edit answer for another 41 minute you need to check the installation instructions from the manufacturer depending on whether the purlins firring strips are 1x or 2x material and how wide thickness metal gage of roofing steel or aluminum type of seams design wind and snow loading whether designed to be walked on or not etc i have seen it vary from as little as 4 inches clear gap between firring strips on lightweight aluminum to as much as 4 feet on very heavy gage steel.
Or installing the new metal roofing over furring strips 1 x 3s or similar will raise the metal and provide a ventilating air pocket between layers.
3 install 1x4 purlins down over the shingles before installing the metal roof the third way to install a metal roof over shingles is by applying 1x4 purlins over the shingle roof.
Rafter spacing is based on the width of the metal roofing panels.
A metal roof must also allow for some overlap on each side of the panels which will reduce the effective width of the panel.
How many furring strip should be used under and metal roof on a 14x 80 mobile home.
If there are gaps around the roof penetration or valley points cut extra sections of furring to fit.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
How far apart do you space furing strips when putting on a metal roof.
Place it two feet apart from the first row.
Wider panels allow for greater spacing between rafters.
When finished there should be a row of furring strips stretching from one end to another with the top edge aligned at the peak.
If trapped between the metal roofing and old roofing moisture can build up and cause mold and rot.